We dismantle single machines, complete production lines and entire plants across Europe. Two routes, one contractor: reinstallation at a new site, or full decommissioning and recycling.
A plant that stops producing has two possible futures. Either the machines run again somewhere else, or they are decommissioned and recycled. We do both, and we decide together with you after the survey which route fits which machine. In practice it is often a mix: part of the machinery park goes back into production elsewhere, the rest is stripped out and recycled.
When the machine is going to keep working, dismantling is simply the first step of the future assembly. Every component, cable and line is labelled and photographed, utilities are disconnected properly, control and automation systems are protected. We add export packing in ISPM 15 crates, AL-VCI corrosion protection and oversized transport. At the destination we reinstall the line, level it and run it in.
When the plant is not going to run again, we strip it out in an orderly way and separate materials by type. Operating fluids are drained and collected separately, metals sorted into fractions, electronics and hazardous materials handled apart. You get the hall back cleared and the documentation you need for your records.
For a complete site we plan the sequence so the hall is released area by area instead of everything being blocked at once. We coordinate cranes, oversized transport and waste removal, align dates with the landlord or the buyer of the property, and keep working when production continues in another part of the plant. Our crews travel to site for the duration of the project and stay there, we do not commute daily.
First an engineer comes to survey the site, not a salesperson. We look at the machines, transport routes, hall doors and floor load capacity, and we read the documentation. Then you get a sequence plan with dates and a price. Only then does the work start. Every project runs with EUR 2.4M liability insurance.
Tell us what needs to come out and where it should go. After the site survey you get a sequence plan and a quote.
Request dismantling →Yes. We dismantle single machines, full production lines and entire sites. On larger plants we plan the work in stages so the hall is released area by area.
That is your call. We can prepare the machine for onward transport, including export packing and reinstallation at the new site, or strip it out for recycling. Both often run in parallel within one project.
Yes. Operating fluids are drained and collected separately, metals sorted by fraction, electronics and hazardous materials handled apart. You get the floor space cleared and the documentation that goes with it.
Yes, that is the normal case in partial shutdowns. We agree working hours, transport routes and barriers with your production team and work in shifts or at weekends where needed.
Poland, Germany, Austria, Switzerland, the Czech Republic and the rest of Europe. Our crews travel to site for the duration of the project. We also handle installation and relocation projects across the same area.